ART 208 Introduction to
Sculpture / TR 9:20-11:50 am / Class
Schedule, Spring 2015
All slide presentations available as
PDFs on BB site
REVISED 2/27/15
|
In-Class Activity |
Work Due |
T 20 |
Review Syllabus / Intro Project 1 (slides) |
|
TH 22 |
Drawing
the body (in class w/ live model) |
Proj. 1 Initial Design / Part 1a: research source artist |
T 27 |
Sculpting
the body/ 2D into 3D |
|
TH 29 |
Carpentry
tech |
Proj. 1 Initial Design / Part 1b: Complete In-class studies ANDÉ.Part 2a: 7 pages 2D studies |
T 3 |
Review all initial
design materials w/ Review writing guidelines |
Proj. 1 Initial Design / Part 2b: 2 3D models |
TH 5 |
Carpentry
tech |
Proj. 1 Final Design /
Part 1: 1200 word review writing |
T 10 |
Sculpture
fabrication: Work time |
Proj. 1 Final Design / Part
2: 5 pages 2D studies Part 3: one
final model |
TH 12 |
Sculpture
fabrication: Work time |
|
|
Snow day |
|
TH 19 |
Sculpture
fabrication: Work time |
Carpentry
worksheet and 3 wood joints due AND submit (email) weekend work log |
T 24 |
Sculpture
fabrication: Work time |
|
|
Snow cancellation |
|
T 3 |
Critique Project 1 |
Proj 1 Final Sculpture Due |
TH 5 |
Intro Project 2 (slides) w/ review of
self- assessment guidelines |
Proj.1 1400 word self assessment using Self-assessment prompts |
T 10 |
Metal tech
/welding overview |
Proj. 2 Initial Design Development / Part 1: assigned rdg. + 800 word writing and Proj. 2 Initial Design Development / Part 2: 4 full page 2D studies |
TH 12 |
Review all initial design materials |
Proj. 2 Initial Design Development / Part 3: 2 3D models |
T 17* |
Spring
break |
|
TH 19* |
Spring break |
|
T 24 |
Model making work time and welding practice |
Proj. 2 Final Design / Part
1: 1200 word review writing Proj. 2 Final Design /
Part 2: 5 pages 2D studies, |
TH 26 |
Sculpture fabrication: Work time |
Proj. 2 Final Design /
Part 3: one final model |
T 31* |
No classÉ Advising day work time (3+ studio hours= 3
pts. extra credit) |
|
TH 2 |
Sculpture fabrication: Work time |
welding practice and worksheet due |
T 7 |
Intro Project 3 |
Submit long weekend work log |
TH 9 |
Critique Project 2 |
Proj 2 Final Sculpture Due AND Proj. 3 Initial Design Development part
1 (visual research ) |
T 14 |
Tech: armatures plaster etc. |
Proj.2
1400 word self assessment using Self-assess prompts AND Proj. 3 Initial Dsign Development part
2 (7 pages 2D studies) |
TH 16 |
Review all initial design materials |
Proj. 3 Initial Dsign Development part 3 (model) |
T 21 |
Sculpture fabrication: Work time |
Proj. 3 Final Design all parts |
TH 23 |
Sculpture fabrication: Work time |
|
T 28 |
Sculpture fabrication: Work time |
Submit Weekend work log / Armatures complete |
TH 30 |
Sculpture fabrication: Work time |
|
|
|
|
T 5 6pm Exam |
Critique project 3 Mon. Dec.
15, 9-11:15 am |
Project 3 Final Sculpture, Self-Assessment and art event write-ups |