Back to Schedule / Back to Course Index
ART 233/ The Sculpture Garden Assignment Summary All assignment descriptions to be found on class schedule. Team assignments will be completed by design teams made up
of 3-4 students each as designated by Lisa on Jan 30. Evaluations will be completed per each class segment after
the submission of corresponding self-assessment. |
|||
Due Date |
assignment |
submit |
% of project
phase grade |
Research
and Development Phase (% 35 of final grade) |
|||
Jan W 23 |
2 David Smith drawings |
post on wall |
individual assignment 10% |
W 30 |
14 landscape drawings |
post on wall (best 4) |
individual assignment 15% |
Feb M 4 |
3 sculpture collages |
post on wall |
individual assignment 10% |
M 11 |
Carpentry practice |
hand in |
individual assignment 10% |
M 11 |
Site analysis report |
post on wall |
team project 10% |
M 18 |
2 context research posts |
post on wall |
individual assignment 15% |
M 18 |
2 garden reading quotes |
post on wall |
individual assignment 5% |
M 25 |
Welding Practice |
hand in |
individual assignment 10% |
M 25 |
2 garden experience posts |
post on wall |
individual assignment 15% |
W 27 |
Self- assessment |
emailed |
individual assignment |
Design Phase
(% 35 of final grade) |
|||
M 18 |
CAD site drawing |
email file |
team project / 15% |
Mar M 4 |
site model |
hand in |
team project / 20% |
M 4 |
Designing: Initial ideas |
hand in /
writing emailed |
team project / 15% |
W 20 |
Designing: Round 2 |
Hand in / writ. emailed T 19 |
team project / 20% |
M 25 |
Design Presentation |
Public display / writ. emailed |
team project / 30% |
Apr M 1 |
Self- assessment |
emailed |
individual assignment |
Production
Phase (% 30 of final grade) |
|||
TBD |
fabrication installation interpretive materials |
on site |
individual contributions / 100% |
May M 6 |
Self- assessment |
emailed |
individual assignment |