Back to Schedule / Back to Course Index

 

 

 

ART 233/ The Sculpture Garden

Assignment Summary

 

All assignment descriptions to be found on class schedule.

Team assignments will be completed by design teams made up of 3-4 students each as designated by Lisa on Jan 30.

Evaluations will be completed per each class segment after the submission of corresponding self-assessment.

 

Due Date

assignment

submit

% of project phase grade

Research and Development Phase (% 35 of final grade)

Jan W 23

2 David Smith drawings

post on wall

individual assignment  10%

W 30

14 landscape drawings

post on wall (best 4)

individual assignment  15%

Feb M 4

3 sculpture collages

post on wall

individual assignment  10%

M 11

Carpentry practice

hand in

individual assignment  10%

M 11

Site analysis report

post on wall

team project                 10%

M 18

2 context research posts

post on wall

individual assignment  15%

M 18

2 garden reading quotes

post on wall

individual assignment   5%

M 25

Welding Practice

hand in

individual assignment  10%

M 25

2 garden experience posts

post on wall

individual assignment  15%

W 27

Self- assessment

emailed

individual assignment

Design Phase (% 35 of final grade)

M 18

CAD site drawing

email file

team project / 15%

Mar M 4

site model

hand in

team project / 20%

M 4

Designing: Initial ideas

hand in  / writing emailed

team project / 15%

W 20

Designing: Round 2

Hand in / writ. emailed T 19

team project / 20%

M 25

Design Presentation

Public display / writ. emailed

team project / 30%

Apr M 1

Self- assessment

emailed

individual assignment

Production Phase (% 30 of final grade)

TBD

fabrication

installation

interpretive materials

on site

individual contributions  / 100%

 

May M 6

Self- assessment

emailed

individual assignment